Electrofusion Connection Project

Installation of 30 top-entry electrofusion service taps with integrated PEHD 63 saddles – Reference: ELEC_06317020.

Project completion date: October 15, 2024

Installation location: Pas-de-Calais (62)

photo chantier
img 6470
Partager sur